999国产视频_亚洲国产美女精品久久久_亚洲va中文字幕无码久久不卡_国产农村熟妇videos_成人99视频_华人久久

13913110212
Location: Home > NEWS
How to maintain electroplating equipment daily
Time:2023-12-08

Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 欧美丝袜办公室系列brazzers | 99er精品视频 | 伊人久麻豆社区 | 97在线观看免费观看 | 一本色道久久99一综合 | 亚洲欧美日韩免费 | 日本在线视频免费看 | 国产精品久久毛片 | 91大神免费在线观看 | 久草久草视频 | 丁香五月色情婷婷在线观看 | 中文字幕国产在线 | 国产人妻精品一区二区三区 | 无人在线观看高清完整视频 | 欧美综合一区 | 羞羞视频在线观看免费观看 | 亚洲大码熟女在线观看 | 欧美成人精品二区三区99精品 | 夜夜爽网站 | 亚洲人在线视频 | 青草福利视频 | ▇榴莲视频▇在线播放免费 | 久久精品国产亚洲AV水果派 | 性videos熟女意大利 | 国产精品宾馆在线精品酒店 | sss华人在线play| 亚洲欧美日韩一区在线观看 | 亚洲激情 在线 | 欧美高清视频一区二区 | 国产福利毛片 | 老司机精品无码免费视频 | 青青久久精品 | 日本特黄特色大片免费视频 | 日本免费看片 | 最新av免费在线观看 | 亚洲五月综合 | 最近更新中文字幕第一页 | 国产丝袜无码免费视频 | 欧美高清www午色夜在线视频 | 久久国产亚洲AV无码 | 国产免费看av大片的网站吃奶 |