How to maintain electroplating equipment daily
Time:2023-12-08

Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 最近中文字幕视频网 | 三级av网 | 懂色中文一区二区三区在线视频 | 91色交视 | b站影院免费观看 | av一本在线 | 91精品国产高清一区二区三区 | 91大神在线观看精品一区 | 我要综合色 | 国产高清国内精品福利 | 亚洲福利视频一区二区三区 | 国产精品香蕉在线的人 | 欧美爱爱动态 | 国产伦精品一区二区三区免费下载 | 久久精品爱看无码免费视频 | 最近中文字幕国语免费av | 天天天干| 性老妇sexfreexxxx片 | 农村寡妇毛片一级 | 欧美亚洲日本网站 | 欧美高清www午色夜在线视频 | 白丝老师在我胯下娇喘视频 | 爽爽av浪潮av一区二区 | 日韩精品成人无码专区免费 | 正在播放日韩 | 男女又爽又黄免费直播 | 欧美日韩高清在线播放 | 国产在线精品一区 | 999av视频| 国产成人在线网址 | 日女人b视频 | 女人毛片a级大学毛片免费 91p九色成人 | 一级毛片毛片 | 又粗又硬国语对白 | 欧美伊人久久大香线蕉综合 | www.日本在线 | 无码国产精品免费看 | 国产亚洲欧美在线 | 国产精品亚洲А∨天堂网 | 国产激情久久久久久熟女老人 | 欧美激情性国产欧美无遮挡 |